Koi Pond Pavillion

Coal Valley, IL
Client: 
Niabi Zoo
Designer: 
Studio BNA Architects, Athens Georgia
Contract Amount: 
$280,000
Delivery Method: 
Construction Management / General Contracting
Summary: 

The new pavilion is a wood structure starting with driven wood piles, stringers, decking, and railings for the two access bridges to the pavilion. The pavilion is of the same type of structure including standing seam roof. Lighting consisting of LED accent at the bridges and overhead LED at the pavilion. All wood was treated with a light color stain to enhance the natural color. The pond was drained so that the existing pavilion could be demolished and the new one constructed.

Type of Work: