6th Avenue Parking Facility
Moline, IL
Client:
The City of Moline
Designer:
Phillips Swager Associates
Contract Amount:
$5,900,000.00
Delivery Method:
General Contracting
Summary:
The construction of a post-tensioned concrete 400 stall parking structure in downtown Moline, IL. The deep foundations for this structure included reinforced concrete drilled shafts. The project included two cast-in-place concrete stair towers and an elevator shaft.
Type of Work: